Recently GN shipped high G force drying shaker and mud cleaner for offshore project. The technical configuration is as below:
1) The shale shaker is installed on the catching tank with offshore lifting standard, The lifting pad on the 4 corners of the catching tank is made to meet the offshore lifting standard. GN F version high G force drying shaker with G force up to 8.0G, the 2 nos of Italy Oil vibration motor are equipped with the shale shaker, GN own made explosion proof starter have options of ATEX, IEC EX to meet different client’s requirement. As the first phased cleaning equipment, the performance of the shale shaker is very important, a good performance shale shaker will reduce the drilling waste, recover more useful drilling fluids, reduce the coarse solids effectively from the drilling fluids, and protect the further equipments like centrifugal pump, desander cone, desilter cone, so that they will not be damaged by coarse solids and high solids content, the users can save drilling cost a lot.
2) The mud cleaner is also called 3 in 1, it is the combination of underflow flow shale shaker, desilter cone and desander cone. The desander cone is the second phase cleaning with separation cut point 45 microns, the desilter cone is the third phase cleaning with separation cut point 25 microns.
3) The shaker screens equipped with the shale shaker and mud cleaner is composite material frame shaker screens, the working life is much longer than normal steel frame shaker screens, the storage life is up to 5 years, the effective screen area is 20% larger than traditional steel frame shaker screens.
The solids control equipments and drilling waste management equipments produced by GN solids control can be used for both onshore drilling and offshore drilling project, welcome to contact us.