Mud tank System for oil drilling to India Company

This week one complete set of mud tank system are ready for delivery to India oil drilling company. This is a customized mud tank system and a repeat order from the drilling company. The detailed technical configuration is as below:


1) Total active tank volume 80m3, water tank volume 40m3, trip tank volume 8m3, pill tank volume 8m3


2) The solids control equipments installed on the mud tank system including 1 unit of mud gas separator, 2 units of double deck shale shaker ( the treating capacity is up to 600gpm), 1 unit of desander, 1 unit of mud cleaner, 1 unit of vacuum degasser, 1 unit of high speed decanter centrifuge, 2 units of desander desilter feeding pump, 1 unit of mixing pump with mixing hopper, 1 unit of trip pump for trip tank, 1 unit of water pump, 1 unit of pill tank transfer pump, 1 unit of decanter centrifuge feeding pump, 4 units of mud agitator, 8 units of mud gun and other mud tank accessories, such as radar liquid level meter, audible visual alarm, IEC explosion proof control system, walkway, guardrail, stairs, pipelines, etc.


3) Shaker screen and complete set of spare parts, the shaker screen used for shale shaker and mud cleaner is OEM produced by GN solids control comply with API RP13C standard, the composite material shaker screen frame with 3 layers of stainless steel wire mesh and 4 sides pre-tensioned to ensure longer working life of the screens, and save time for screen replacement.


The mud tank system is designed as per client’s requirement and their rig site layout, it will be packed as sea worthy package to be shipped by containers or bulk cargo. If you need a customized solids control system for oil drilling rig, pls contact with GN solids sales.

Leave a Reply

Your email address will not be published. Required fields are marked *