Tandem Shale Shakers for Middle East Oilfield Service Company

Tandem shale shakers are shipped to Middle East Oilfield Service Company this week, the technical configuration is as below:
1) 2 single deck shale shaker installed on one tandem skid, with possem belly. When loading in the container, the single shale shaker will be packed by wooden pallet separately, the skid will be fixed by special made frame, the possem belly will be protected by plastic flim and disassembly to fit to the container size.


2) The 2 tandem shale shaker treating capacity is up to 1200gpm for drilling fluids of both WBM & OBM & SOBM. We can provide the shaker screens with API NO. from API 20 to API 325 as per clients’ requirement. The shaker screens are composite material frame shaker screens for longer working life and larger screen area. Each single shale shaker is equipped with 3pcs shaker screens for free.
3) The shaker deck bottom is made of stainless steel 304 for better corrosion resistance of the fluids touch part. The shaker skid is made of high grade structure steel. The screens are locking by the wedges for fast replacement of the shaker screens, the user do not waste much time to replace the shaker screens, and the screens working life is average 300 hours, it reduces the times to replace the screens.
4) The compact design is for convenient transportation from one rigsite to another.
We can also produce the triple shale shakers as per the client’s requirement, to install 3 units of linear motion shale shaker on one oilfield skid. The explosion proof vibration motor and starter could be CNEX, ATEX OR IEC EX for option as per the different requirement.
If you require shale shaker, mud cleaner, decanter centrifuge, vacuum degasser, pls contact with GN solids control, we can also produce customized tandem shale shaker.

Leave a Reply

Your email address will not be published. Required fields are marked *